Plan
Resolve the services before the finishes.
We work from the bathroom layout and product specification so supplies, wastes and heating are positioned for the final fittings.
Bathrooms Appliances · Bathroom Installations
Bathroom plumbing and installation across the Cotswolds, with the hidden services planned as carefully as the fittings you see every day.
The finish depends on the first fix
Pipe routes, wastes, falls, valve access and fitting positions all need to be resolved before tiles, joinery and sanitaryware make changes difficult.
We provide plumbing for complete bathroom installations and renovations, including first-fix alterations, sanitaryware, taps, wastes, radiators and final connections.
Where the project involves broader building work, the Clarke Construction Group relationship allows plumbing to sit naturally within the wider programme rather than being treated as an isolated trade.
Plan
We work from the bathroom layout and product specification so supplies, wastes and heating are positioned for the final fittings.
First fix
Pipework and wastes are installed or altered while access is available, with future maintenance considered where possible.
Second fix
Sanitaryware, taps, wastes, valves and heating components are connected, aligned and tested as the bathroom reaches completion.
The detail
First-fix hot and cold supplies
Waste and soil connections
Toilets and concealed cisterns
Basins and vanity units
Bath and shower plumbing
Taps and mixers
Radiators and heated towel rails
Final testing and commissioning of plumbing fittings
The CCG approach
“The best bathroom details are planned before the tiles arrive.”
Good to know
Bathrooms bring together plumbing, electrical work, waterproofing, tiling, joinery, ventilation and decoration. Good coordination prevents one trade’s solution becoming another trade’s problem.
Supply, waste, sanitaryware and heating need to be resolved around the chosen layout.
Walls, floors, niches and access panels may affect where services can sensibly run.
Tile setting-out, vanity positions and visible fittings all depend on accurate first-fix work.
The CCG difference
That wider construction perspective is one of the clearest advantages of using CCG Plumbing & Heating for a bathroom project.
We prefer to resolve service positions before the room is closed up.
The actual sanitaryware and brassware specification informs the plumbing.
Alignment, visible pipework and access details matter.
On larger projects, other CCG trades can coordinate around the same programme.
From enquiry to completion
Clear communication from the first conversation through to finished work.
Send drawings, product information or photographs of the existing room.
We review the existing services, proposed layout and access.
We set out the plumbing scope and any assumptions clearly.
The agreed plumbing work is coordinated through the bathroom programme and tested at completion.
Frequently asked questions
Useful answers before you arrange the work.
We can work with client-supplied or specified sanitaryware and brassware. Supply arrangements can be discussed for individual projects.
Often, yes, but waste routes, floor construction and soil-pipe positions can make some moves more practical than others.
CCG Plumbing & Heating focuses on plumbing and heating. As part of Clarke Construction Group, wider building and finishing trades may be available for suitable projects.
Yes, where it is suitable for the heating system and bathroom layout.
Ideally before finishes are ordered or first-fix work begins. Early input helps confirm that the proposed layout and products are practical to install.
Free quotation
Whether you are planning a new heating system, dealing with a repair or simply need some advice, send us the details and our team will get back to you.